Land Drainage

 

Primary

The key to constructing a successful natural grass sports pitch that stands up to today’s elements is the drainage.  A drainage system can be designed to meet both budget and the client’s requirements, ranging from basic piped systems to more complex performance design coupled with the latest specialist drainage equipment we can deliver the results that count.

Brochure_Drainage2 Henbury
Imperial Sports Ground Henbury School

Secondary

Installing secondary drainage using either sand slits, gravel, lytag or rubber crumb assists surface water to reach the primary land drainage more efficiently.   Our specialist machinery fitted with low ground pressure tyres ensures minimal disturbance to the playing surface allowing sports to be played after the installation.

Clifton_College Brochure_Sand_slits
Secondary drainage at Clifton College Sand Banding at Emerson Green

 

 

 
 
 
CutThroughNew